I haven't managed to keep up to date with this blog, and it's well overdue for a new post.. The build is behind schedule which doesn't particularly surprise me . I don't really mind as I would like to to stay in my present house (next door ) until the end of the Summer. The house build began on March 8th 2018 and was supposed to be finished by March 8th this year, and then it was May this year, and now the date is supposed to be July 18th, but I'm not holding my breath, and anyway, late August would suit me fine. The interior of the house seems to have remained the same for quite a few months, that is to say, a bit of a mess, but now the walls have gone up its easier to understand the interior and judge the size of the rooms - pretty small! especially when compared to my present house next door with its 13 1/2 foot high ceilings , which is a lot of space to heat in the winter. The new house will feel a lot smaller, but then it is!
The outside structure of the house is completed, including the solar panels on the roof, and the rendering of the lower part . So now the builders are working on the inside, which is quite complicated, what with its Mechanical Heat Recovery and Ventilation System. Google it if you're interested because I'm not up to explaining it, or how it works, or what I will have to do to it when I live in the house. There is also underfloor heating which somebody said can take quite a long time to actually heat the house. However we are confident we'll be so warm we'll be sitting in swimsuits in mid-winter leaning out of the triple glazed windows in a phenomenally well insulated house, gasping for a breath of cool air, especially with the a log burner going as well.
Trying to negotiate the maze that is the Solar Feed In Tariff ( Government scheme for paying house holders for extra electricity generated by solar panels) has been fiendishly bureaucratic and difficult. This scheme has now been stopped - so much for this Government's (lack of) commitment to Green Energy, but the deadline was met by a whisker. I'm looking forward to selling electricity back to the Grid.
Here follows a small moan about the builders. I note that I mentioned in the last post that I was told to decide , with a day's notice, on the bathroom tiles. Well, they're still not on the walls over 6 months later, and they left it so late to actually order them from the supplier that they had stopped stocking one of the designs . This has been the story all along - 'you must decide on floors, handles, doors, paint, external pavers, and so on.........right now! so I rush about in a panic, making decisions in a mad hurry only to discover that in fact they don't need whatever it is they wanted so urgently after all. This is very annoying and frustrating and has meant that I might have chosen differently and/or better if I was given more notice. I wonder if all builds are like this. Now I know why interior designers are used - a pity I didn't think of this earlier, but I don't suppose I would have wanted to fork out the fee for one..
Some pictures of progress :
Photo taken through the mucky window, this is the rear (East) courtyard. No, the square conrete structure on the right hand side isn't a pond or a paddling pool but will be a planting area. The ladder is for the builders to get to the greenhouse , in my back garden next door to have their tea and lunch breaks. I think I'll put a smaller ladder there in order to get up to the top level of the courtyard where there will be large pot planters and maybe even a bit of statuary. I've come round to an appreciation of exposed concrete, though I was alarmed at first to see the concrete courtyard and basement being built with their thick high retaining walls. I rather like the marks and patterns on it. I think I'm becoming a fan of mid 20th century Brutalism.
Kitchen/diner East. Ground Floor
Rear room. East. 1st floor
Looking out the rear window. 1st floor
Bathroom, (West) 1st floor
Bathroom floor being tiled
Front room (West) 1st floor
Room in the roof (2nd floor) and shower room with a little window looking out (west) to one of Brighton's beautiful Elm trees. Plastered, and with the first spray coat of non-toxic 'eco' paint applied.
All the scaffolding removed at last and here it is in all it's modest glory. I'm rather pleased with the solar panelsl; I like the way the colours of the pink Tamarisk and the tiled Church Hall roof contrast with the blue/ grey zinc. It looks quite 'industrial'. Very different to all the late Victorian houses and Church surrounding it , in this Conservation area . I'm glad the Planners didn't force me to do a pastiche.
Front of the house waiting for its front door. To the left the temporary wooden structure stops people falling into the rather scarily deep basement .which will
have railings on two sides and steps down to basement area when it's done.